|
|
|
|
Trip generation data for each project shall be based upon the Institute of Traffic Engineers' Trip Generation Manual, supplemented by any other data deemed reliable by the Town. The following other standards also apply to projects:
(1) Credit for Mixed Use, Pass-By Trips
The determination of the number of trips generated shall also take into account pass-by trips, internal trip capture for integrated mixed use projects (e.g., roadway and/or pedestrian connectivity) and any proposed transportation demand management system, provided that adequate guarantees can be provided to the Town to ensure that such demand management system will function as claimed for the life of the project. In addition, if the proposed development is designed and integrated with an adjacent mixed use project (e.g., roadways), then a credit for trips may be permitted.
(2) Estimated Trips for Rezonings/PDDs
In evaluating the impact of a proposed rezoning or planned development where the specific uses or exact number of dwelling units have not been specified, estimates shall be based upon the highest level of density or intensity of use that would be authorized by the requested approvals.
Cary, NC Land Development Ordinance On-line VIC Version - This site last updated 3/4/2008
Note: This is not the official version of the Cary Land Development Ordinance