7.4.7 Operations in Lakes or Natural Watercourses
Land-disturbing
activities for construction in,
on, over, or under a lake
or natural watercourse shall be planned and conducted so as to
minimize the extent and duration of disturbance of the stream channel
or lakebed. Where relocation of a stream is
an essential component of the proposed activity, the relocation shall be
planned and executed so as to minimize changes in the stream flow
characteristics, except where the developer or
landowner demonstrates
to the Planning Director that significant alteration to the flow
characteristics is justified.
Cary, NC Land Development Ordinance On-line VIC Version - This site last
updated 3/4/2008
Note: This is not the official version of the Cary Land Development
Ordinance