(A)     A point-by-point lighting plan is required for site plan approval that indicates the foot-candles at grade grid points that cover the site. The Planning Director can waive this requirement for small independent projects on less than an acre if the fixture types are specified on the plan.

(B)     Any changes to the lighting plan must be approved by the Planning Director through a site and/or subdivision plan revision.

 